Poipu Beach Force Main and Reclaim Pipelines Installed on Kauai by Earthworks Pacific using FPVC™

In October 2007, Underground Solutions, Inc. (UGSI) teamed with Earthworks Pacific to provide UGSI's FPVC™ pipe systems as a valued engineered solution for the new force main and reclaim lines installed as part of the new Koloa Regional WWTP infrastructure project near Poipu Beach, HI.

Pipeline Details and Project Summary
  • Project:
  • Location:
  • Length:
  • Pipe size:
  •  
  • Installation:
  • UGSI Contact:
  • Poipu Beach Force Main and Reclaim Pipelines
  • Poipu Beach, Kauai, HI
  • 4,500 LF
  • Force Main 14" DR25 FPVC™
  • Reclaim Line 6" DR26 FPVC™
  • Direct Bury
  • Rob Craw - (925)577-7566 rcraw@undergroundsolutions.com

FPVC™ and HDPE were both considered suitable pipe materials for this project. Following a technical and commercial value-engineering analysis, FPVC™ was selected due to the ability to downsize the force main pipeline from 16" HDPE pipe to a 14" FPVC™ while providing increased flow and cyclic design capacity.

Project Manager, Ann Sokei with Aqua Engineers stated: "The project went as scheduled and we were excited to be able to provide a value-engineered proposal to our client. We will continue to specify this material on other upcoming projects".

Fusion Services

Fusion Services

FPVC<sup>®</sup> Installation

Installation

Dual Force Mains

Dual 14" Force Mains